The Town of Fuquay-Varina is proposing to construct intersection improvements at US 401 (North Main Street) and Mill Creek Drive. The proposed project would include the construction of the following new dedicated turn lanes:
» A second southbound left-turn lane from US 401 onto Wallace Adcock Blvd.
» A northbound right-turn lane from US 401 onto Wallace Adcock Blvd.
» An eastbound left-turn lane from Mill Creek Drive onto US 401
» An eastbound right-turn lane from Mill Creek Drive onto US 401
Additional improvements include installing crosswalks with pedestrian refuge islands, Americans with Disabilities Act compliant curb ramps, sidewalks Continue reading
Original source can be found here